skip to main |
skip to sidebar
Back to Moose
This week at the visitor center was an adventure. On Wednesday we had strong winds and the tenting started to come down. We were trying to brace it from the inside but the wind was too strong, and the braces that were in were 'exploding.' No, I mean it, they just exploded in the middle. So we took the two gradall lifts out and tied the tent to them and pulled it out a bit while we re-braced the inside. It was kind of scary. This picture shows one lift still tied there the next day. I have said before that this will be a beautiful building. Even the ceiling is beautiful. The most exciting thing is that we finally set the first bit of glass in the big curtain wall. The glass is also big. The typical size (the glass that is not in corners or on the top row) glass is 64" x 109". In other words BIG. This is the first one we set. Next week we should have a lot more set. It will be really cool when it is done.
No comments:
Post a Comment